Type: | Trad, TR |
FA: | Mike Olson, 2002 |
Page Views: | 1,207 total · 14/month |
Shared By: | tbol on Mar 16, 2016 |
Admins: | Leo Paik, John McNamee, Frances Fierst, Monty, Monomaniac, Tyler KC |
Your To-Do List:
Add To-Do ·
Per Kai Bouwman: the daily CO 7 highway closure/delay access issue is no longer a problem according to CDOT the construction finished as of Nov. 11, 2022.
From CDOT: Colorado Highway 7 is closed daily from MP 23-29.5. Motorists can only travel through the area between 6-8 am and 4-7 pm. During these timeframes, pilot cars will lead alternating one-way travel. Drivers should plan for delays, and this schedule will remain in place through Memorial Day 2022.
During the closure, motorists need to take US 36 to CO 7.
codot.gov/projects/co7-lyon…
From CDOT: Colorado Highway 7 is closed daily from MP 23-29.5. Motorists can only travel through the area between 6-8 am and 4-7 pm. During these timeframes, pilot cars will lead alternating one-way travel. Drivers should plan for delays, and this schedule will remain in place through Memorial Day 2022.
During the closure, motorists need to take US 36 to CO 7.
codot.gov/projects/co7-lyon…
Description
This pitch is a fun combo of bolt clipping and crack climbing. Clip the first 10 bolts on Botany of Desire (5.11), then traverse right and finish up the interesting and steep crack. The climb finishes at the anchors for Temptation Arete.
Location
On the far left side of Trojan Bunny Buttress, start on Botany of Desire, and finish on the anchor of Temptation Arete.
3 Comments