Suggested Page Improvements to Coringa
I would recommend bringing a 60 m rope. I brought a 57ish meter rope that was barely long enough for the first pitch.
The route is 2-3 pitches. It's all fairly straightforward 5.6 slab climbing, with a few short vertical moves.
The last two pitches can easily be combined as they are short, but many guiding groups break them up into two pitches since they are a bit tricky, and communication is difficult if done in one pitch.
The last belay is a body belay, or you can tie off a boulder.
The route is 2-3 pitches. It's all fairly straightforward 5.6 slab climbing, with a few short vertical moves.
The last two pitches can easily be combined as they are short, but many guiding groups break them up into two pitches since they are a bit tricky, and communication is difficult if done in one pitch.
The last belay is a body belay, or you can tie off a boulder.