Mountain Project Logo

Fixed Hardware for First Brew 5.10a

7 pieces of fixed hardware

Pitch Use Position Type Description Last Update Condition Installed Notes  
1 Lead 1 Bolt Lappas 10mm x 100mm Meteora P-Shaped Glue-in Bolt, DeWalt AC100 Gold May 1, 2025 Bomber May 1, 2025
1 Lead 2 Bolt Lappas 10mm x 100mm Meteora P-Shaped Glue-in Bolt, DeWalt AC100 Gold May 1, 2025 Bomber May 1, 2025
1 Lead 3 Bolt Lappas 10mm x 100mm Meteora P-Shaped Glue-in Bolt, DeWalt AC100 Gold May 1, 2025 Bomber May 1, 2025
1 Lead 4 Bolt Lappas 10mm x 100mm Meteora P-Shaped Glue-in Bolt, DeWalt AC100 Gold May 1, 2025 Bomber May 1, 2025
1 Lead 5 Bolt Lappas 10mm x 100mm Meteora P-Shaped Glue-in Bolt, DeWalt AC100 Gold May 1, 2025 Bomber May 1, 2025
1 Anchor 1 Bolt Raumer 10mm x 120mm P-Shaped Glue-in Bolt, DeWalt AC100 Gold May 1, 2025 Bomber May 1, 2025
1 Anchor 2 Bolt Raumer 10mm x 120mm P-Shaped Glue-in Bolt, DeWalt AC100 Gold May 1, 2025 Bomber May 1, 2025

Fixed Hardware

All Locations
Nevada (31)
Red Rocks (31)
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.