Mountain Project Logo

Fixed Hardware for The Sacred and the Profane 5.13- R

6 pieces of fixed hardware

Pitch Use Position Type Description Last Update Condition Installed Notes  
1 Lead 1 Bolt 1/2" x 2.75" SS PowerBolt w/ClimbTech SS hanger Jul 12, 2015 Bomber Jul 12, 2015
1 Lead 2 Bolt 1/2" x 2.75" SS PowerBolt w/ClimbTech SS hanger Jul 12, 2015 Bomber Jul 12, 2015
1 Lead 3 Bolt 1/2" x 2.75" SS PowerBolt w/ClimbTech SS hanger Jul 12, 2015 Bomber Jul 12, 2015
1 Lead 4 Bolt 1/2" x 2.75" SS PowerBolt w/ClimbTech SS hanger Jul 12, 2015 Bomber Jul 12, 2015
1 Belay 1 Bolt 1/2" x 4.75" SS PowerBolt w/ClimbTech double ring SS hanger Jul 12, 2015 Bomber Jul 12, 2015
1 Belay 2 Bolt 1/2" x 4.75" SS PowerBolt w/Fixe SS 9" chain and ring Jul 12, 2015 Bomber Jul 12, 2015

Fixed Hardware

All Locations
Colorado (2,294)
Boulder (1,750)
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.