Mountain Project Logo

Fixed Hardware for Direct Cop Out 5.10b

12 pieces of fixed hardware

Pitch Use Position Type Description Last Update Condition Installed Notes  
1 Lead 1 Bolt Plated 3/8" stud Nov 13, 2016 unknown unknown
1 Lead 2 Bolt Plated 3/8" stud Nov 13, 2016 unknown unknown
1 Lead 3 Bolt Plated 3/8" stud Nov 13, 2016 unknown unknown
1 Lead 4 Bolt Plated 3/8" stud Nov 13, 2016 unknown unknown
1 Belay 5 Bolt Plated stud with a weld-shut Nov 13, 2016 unknown unknown
1 Belay 5 Bolt 1/2" plated rawl with a homemade bent steel hanger Nov 13, 2016 unknown unknown
2 Lead 1 Bolt 1/2" SS PowerBolt Nov 14, 2016 Bomber Nov 4, 2016
2 Lead 2 Bolt plated stud Nov 13, 2016 unknown unknown
2 Lead 3 Bolt plated stud Nov 13, 2016 unknown unknown
2 Lead 4 Bolt 1/2" SS PowerBolt Nov 14, 2016 Bomber Nov 4, 2016
2 Belay 5 Bolt 1/2" SS PowerBolt and quicklinks+rings Nov 14, 2016 Bomber Nov 4, 2016
2 Belay 5 Bolt 1/2" SS PowerBolt and quicklinks+rings Nov 14, 2016 Bomber Nov 4, 2016

Fixed Hardware

All Locations
Colorado (2,295)
Boulder (1,751)
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.