Mountain Project Logo

Fixed Hardware for Bolting for Glory 5.10a

4 pieces of fixed hardware

Pitch Use Position Type Description Last Update Condition Installed Notes  
1 Lead 1 Bolt Powers PS Jul 29, 2013 Bomber Jun 14, 2012 Plated bolt and SS hanger - should be inspected/replaced in 2039 (or sooner).
1 Lead 2 Bolt Powers PS Jul 29, 2013 Bomber Jun 14, 2012 PS bolt and SS hanger should be inspected/replaced in 2039
1 Lead 3 Bolt Powers PS Jul 29, 2013 Bomber Jun 14, 2012 PS bolt and SS hanger should be inspected/replaced in 2039
1 Lead 4 Bolt Powers PS Jul 29, 2013 Bomber Jun 14, 2012 PS bolt and SS hanger should be inspected/replaced in 2039

Fixed Hardware

All Locations
Colorado (2,294)
Boulder (1,750)
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.