Mountain Project Logo

Fixed Hardware for Hands In The Clouds 5.12a A0

1 pieces of fixed hardware

Pitch Use Position Type Description Last Update Condition Installed Notes  
1 Lead 5 Bolt 1/2" x 2.75" SS 5-piece Powers bolt with SS ClimbTech hanger. Sep 28, 2016 Bomber Sep 28, 2016

Fixed Hardware

All Locations
Colorado (2,294)
Boulder (1,750)
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.