Mountain Project Logo

Fixed Hardware for Touch 'N' Go 5.9-

2 pieces of fixed hardware

Pitch Use Position Type Description Last Update Condition Installed Notes  
2 Belay 1 Bolt 1/2 x 2.75 SS PowerBolt w/ClimbTech double-ring SS hanger Mar 17, 2018 Bomber Mar 17, 2018
2 Belay 2 Bolt 1/2 x 2.75 SS PowerBolt w/ClimbTech double-ring SS hanger Mar 17, 2018 Bomber Mar 17, 2018

Fixed Hardware

All Locations
Colorado (2,294)
Boulder (1,750)
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.