Stairmaster
V5-6 YDS 6C+ Font
| Type: | Boulder |
| GPS: | 35.78376, -78.67237 |
| FA: | unknown |
| Page Views: | 32 total · 16/month |
| Shared By: | Sam Rex on Nov 15, 2025 |
| Admins: | Steve Lineberry, Aaron Parlier |
Description
Start matched on a good crimp then go out right to a sidepull glue on that is the first hold on the overhang on the far right. Up left to a undercling pinch followed by a slopey pinch with the right. All done with the starting feet then move feet you can use the big obvious undercling in the middle and the cylinder right below it for feet. Then you can use the edge of the wall and work your way up to the top out on the stairs. Railing is on. For the grade, I'm really not sure. Just put something down to do it.
Beta vid is the best way to figur out holds: https://drive.google.com/file/d/1DnV4tfBVls47pm0XTq-4n_RmtGybyxw8/view?usp=sharing



0 Comments