ClimbingOn wrote: Cut off the sling and clip a carabiner directly to the cable. I've never seen a C4 do that before.
Pretty sure they break easier that way and BD recommends against it. And maybe cut the sling easier without the coating on the cable.
I’d send it to BD. It’s a liability now. If I was in a desperate situation I’d wrap a bunch of tape around the cable but clearly you’re not in a desperate situation.
Ha I've had a #3 that started happening to. Most of the plastic is still on there but cracked and I just covered it in electrical tape. Good to know that BD will just replace that no questions, I'll have to send that in soon.