Detailed Report for Hardware in Bataan
2 pieces of fixed hardware
| Pitch | Use | Position | Type | Description | Last Update | Condition | Installed | Notes | Private | Route |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Lead | 1 | Bolt | First Bolt | Apr 20, 2026 | Bomber | Aug 2, 2025 | Added to prevent extreme flossing from a failed dyno | Turbo Sapien | |
| 1 | Lead | 2 | Bolt | Moved second bolt up to protect the dyno | Apr 20, 2026 | Bomber | Aug 2, 2025 | Turbo Sapien |


