Mountain Project Logo

What is a runout?

Buzz Letzter · · Kosa'aay (San Diego) · Joined May 2022 · Points: 367

Sharing if it's relevant...

Just bolted a line at this crag I've been working on and, of the 40 something routes there, it'll likely be the only PG13 route there. Clean fall but a big fall. 

I kept debating on putting another bolt in (past the last good bolt prior to the slab runout) but I found that, if I added another bolt (which would eliminate the PG13), the clipping stance would be the main crux of the route. Clipping that bolt would've (IMO) killed the flow of the route and I feel like the clip would be so hard to make that it'd almost make for a worse/scary fall. 

So instead, it's just runout and, if you do blow the runout, you're still falling into nothing....just a long distance of nothing. 

Mr Rogers · · Pollock Pines and Bay area CA · Joined Aug 2010 · Points: 92

Definitely relevant.
As you describe your situation it is not dangerous, and gives a good teaching/training moment around mental fortitude, and confronting the fear in taking the whip.
I totally support top down scenarios like this, especially as you describe it keeps good flow instead of a tricky clip that might make it actually harder than just pushing through.

You'll find out very quickly after more souls get on your rig if the extra bolt is warranted / wanted and be able to decide if it should stay that way. Especially if it doesn't get climbed and is a quality route.

Keep up the good work.

Logan Peterson · · Santa Fe, NM · Joined Jan 2015 · Points: 403

Buzz, I like your approach here. If the route gets much traffic and especially if it's on the easier side, people will complain. A lot of folks expect bolts where they want them and don't understand that in some cases, a bolt in the most convenient location might actually add risk.

The few giant, clean falls I've taken have been important to my development, and I recall them with a certain nostalgia (even though I do my best to avoid this experience). This said, one option for sanitizing your route might be adding a fixed draw just below the slab. You know better than I whether this would be practical (solid rock, relatively easy to clip) and in-line with the local ethics and aesthetics.

Finally, I'll say that at a popular sport crag, I appreciate the presence of a few good but unpopular routes!

Buzz Letzter · · Kosa'aay (San Diego) · Joined May 2022 · Points: 367

Thanks for sharing...super insightful. We shall see the feedback once some more tortured souls get on it! It's one of my favorite routes at the crag but I wouldn't doubt that only a few will climb it...it's an 11b slab route so it's going to attract a specific climber. 

If anyone would like to see the digital guidebook, please DM me and I'll send over the PDF version (still rough draft but you'll be able to see all the goodies). I'm always open to feedback too...it's my 1st attempt at a digital (pocket guide) book. 

Eric Bluemn · · Boise, ID · Joined Jul 2008 · Points: 5,863

"I shall not today attempt further to define the kinds of material I understand to be embraced within that shorthand description ["runout"], and perhaps I could never succeed in intelligibly doing so. But I know it when I see it, and the route involved in this discussion is not that."

Paraphrasing... or something.

Cherokee Nunes · · Unknown Hometown · Joined May 2015 · Points: 0

That's obsene.

Apt, as well.

Franck Vee · · Unknown Hometown · Joined Apr 2017 · Points: 260
Buzz Letzter wrote:

Sharing if it's relevant...

Just bolted a line at this crag I've been working on and, of the 40 something routes there, it'll likely be the only PG13 route there. Clean fall but a big fall. 

I kept debating on putting another bolt in (past the last good bolt prior to the slab runout) but I found that, if I added another bolt (which would eliminate the PG13), the clipping stance would be the main crux of the route. Clipping that bolt would've (IMO) killed the flow of the route and I feel like the clip would be so hard to make that it'd almost make for a worse/scary fall. 

So instead, it's just runout and, if you do blow the runout, you're still falling into nothing....just a long distance of nothing. 

Interesting example. Different, but this is also somewhat like I feel about my case. I like the aesthetic of a first half that's bolted, with movements & rocks that fits that style well. Then, a 2nd half that's trad, and fits that style as well.

That is kind of it -- the flow of route changes (potentially) with a bolt being added or not. So the question becomes whether or not the benefits of adding it overweight the drawback. In my case, this isn't a matter of safety. It's a blank vertical face. Nobody hits nothing falling, even if at the anchor. I get fewer people may get on it if the description says "... then run the last 10-12 feet to the anchors.". I'm sure some people still would. Maybe I should call it "safe thrills".

Guideline #1: Don't be a jerk.

Fixed Hardware: Bolts & Anchors
Post a Reply to "What is a runout?"

Log In to Reply
Welcome

Join the Community! It's FREE

Already have an account? Login to close this notice.