Locker on Permadraw?
|
|
I'm developing a new steep and hard route that features a massive 9-foot dyno out one of it's tiered roofs. Thankfully, the rock is strong for the bolt that is going to protect it, but i'm worried about the chance of a rope unclipping during flight, Though I know the chance is miniscule, this would be a catasrophic fall due to features below. The rock quality is too poor below the roof to add a supplemental bolt that would catch in the event of the rope coming out of the main draw, which is why I am considering adding a locker to the end of the perma in strong rock that protects the sequence. Has anyone seen this or implemented it on a route? Are there lockers that are easy to use with one hand for a clip? Or am I just overthinking it? |
|
|
Is the stance for clipping good? Each attempt will require unlocking the carabiner, clipping, and relocking unless you use something like a slide lock or twin gate carabiner. I wouldn't recommend this, and would instead suggest having a single perma, but connected with chain, such that a user could clip their own second quickdraw to the quicklink or chain with the gate in the opposite direction to functionally have opposite and opposed carabiners there. |
|
|
Smith Rock has practice bolts (in the middle of cruxes) - not to be clipped on lead, is this also an option? |
|
|
Lockers inevitably gunk up if left outside, small grit gets in the threads, autolockers seize up, etc. A working bolt midway through the dyno, not intended to be clipped on redpoints (like Nigel suggests, guess they're called "practice bolts" in England) would be an option. I suppose another option would be to double-draw it (opposite and opposed permas), but that sounds really odd? |
|
|
That's not really standard practice. I would drill a hole where you want the bolt and use an RB in the hole. Then test where the rope runs when you do the move. If the rope runs over the gate in a concerning way, I'd move the bolt left or right so that doesn't happen. |
|
|
I appreciate the responses from everyone! Tal, the clipping stance is fantastic, which is why I was considering a locker in the first place. If I would go that route, I was thinking of using a sliding or dual gate locker anyways for efficiency. I do like the idea of using a chain instead of a standard perma though, because it would be pretty easy to then have two opposed gates that don't look too awkward. Usually I don't use chains for permas as they can add noticeable weight later on in the route, but that may be the best solution! To answer the other questions, I use a ton of working bolts on my climbs already during hard sequences, so I'm very familiar with the practice. Unfortunately the rock is too poor underneath the main bolt to facilitate one, hence why I want to ensure the current one doesn't have a mishap. I have already tested the sequence with a removable bolt to identify the rope physics, and while it seems perfectly fine I have witnessed a similair dyno (ruff life at CC) unclip in a freak incident that lead to a pretty nast fall. If anyone has any other ideas I'd love to hear them, though Tal's idea seems like it may be a winner! |
|
|
Pardon my ignorance but I don't understand the effect of the "working bolt" idea? Wouldn't someone on RP still only clip the single perma, which wouldn't mitigate the risk that Ron is worried about? I like Tal's idea but it seems unlikely that the average climber would think to clip the additional draw. A second perma in the same spot or very close by seems like it would be the most foolproof, though not pretty. |
|
|
Big Red wrote: Worth noting, the line Connor is talking about here is expected to clock in around 14d, so we're not exactly working with the average climber here, and it's highly unlikely for someone to get on it without heeding whatever warning Connor posts about that bolt |
|
|
If you use 6mm stainless chain it wont be significantly heavier than cable draw. Heat shrink tube. |




