Mountain Project Logo

Deleted

Original Post
The Morse-Bradys · · Lander, WY · Joined Aug 2012 · Points: 4,689

I have obtained the desired information. Thank you for your feedback. I have removed my original post as I do not wish to engage. Thank you.

Mark E Dixon · · Possunt, nec posse videntur · Joined Nov 2007 · Points: 974

Cable ties

Abram Herman · · Grand Junction, CO · Joined May 2009 · Points: 20

One method I've seen that seems to work quite nicely is to put a short (~2") section of rubber hose on the chain link, clip the biner on, and then snug the hose down towards the end of the chain to keep the biner in place. A lot of the perma-chains at Solstice Cave in Last Chance Canyon are done this way, and it made for nice easy clipping.

Paul Hutton · · Nephi, UT · Joined Mar 2012 · Points: 740

Duct tape

FrankPS · · Atascadero, CA · Joined Nov 2009 · Points: 276

Maybe wait until you can afford to do a nice job with those steel carabiners with keepers?

DrRockso RRG · · Red River Gorge, KY · Joined Sep 2013 · Points: 815

My two cents is that unless you're on private property owned by yourself or a friend don't leave your garbage aluminum up on routes, even if you are developing the routes. Zip ties work well but are going to add to the permenance and make it harder for a good Samaritan to switch out the biner.

George W · · Unknown Hometown · Joined Sep 2015 · Points: 6

Go big or go home, dude. I'd rather not see a garbage setup on a climb that's worth the time.

Jim Titt · · Germany · Joined Nov 2009 · Points: 490
Ryan and Jesse Morse-Brady wrote:I am looking for a good way to attach standard carabiners to chain to make permadraws that will keep the rope end oriented correctly for clipping? Methods that I have seen: -Tape -Epoxy Putty -Thin wire I know that a steel carabiner with a keeper would be ideal but a $6+ each that can be costly.
Rubber ring like on a normal draw.
Jason Halladay · · Los Alamos, NM · Joined Oct 2005 · Points: 15,153
Abram Herman wrote:One method I've seen that seems to work quite nicely is to put a short (~2") section of rubber hose on the chain link, clip the biner on, and then snug the hose down towards the end of the chain to keep the biner in place. A lot of the perma-chains at Solstice Cave in Last Chance Canyon are done this way, and it made for nice easy clipping.
I've employed this method and find it quite nice. I've also seen shrink tubing used which looked quite effective. Of course, that would have to be done at home and then the chain put in place.
Nick Drake · · Kent, WA · Joined Jan 2015 · Points: 651
FrankPS wrote:Maybe wait until you can afford to do a nice job with those steel carabiners with keepers?
This. Do it once, do it right. If you're leaving it as permadraws get steel cable with captive biners. Climbtech pricing is pretty damn good.
Rob WardenSpaceLizard · · las Vegans, the cosmic void · Joined Dec 2011 · Points: 130

Thread drift... the climb techs are hard to clip... fixe wiregates, met wire gates are good. They are also very cheap... I use alum sometimes don't feel bad.

Guideline #1: Don't be a jerk.

Climbing Gear Discussion
Post a Reply to "Deleted"

Log In to Reply
Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started