Mountain Project Logo

Member Since
Apr 12, 2015
Last Visit: Jan 11, 2018
0 Points Details

Member of
More Info


5.10 6b 20 VII- 19 E2 5b
 76
Power Failure
Trad, Sport 3 pitches
5.10a/b 6a+ 19 VI+ 19 E2 5b
 1
Sand Castle
Trad 2 pitches
5.10- 6a 18 VI+ 18 E1 5a
 2
J + J Swerve
Trad
5.7+ 5a 15 V+ 13 MVS 4b
 920
Birdland
Trad 6 pitches
5.10+ 6b+ 21 VII+ 20 E3 5b
 215
The Nightcrawler
Trad, Sport 5 pitches
5.10b 6a+ 19 VII- 19 E2 5b
 387
Unimpeachable Groping
Sport 7 pitches
Route Name Location Star Rating Difficulty Date
Power Failure Southern Nevada > … > 11-Juniper Canyon > Ginger Buttress
 76
5.10 6b 20 VII- 19 E2 5b Trad, Sport 3 pitches
Sand Castle Southern Nevada > … > 11-Juniper Canyon > Brownstone Wall
 1
5.10a/b 6a+ 19 VI+ 19 E2 5b Trad 2 pitches
J + J Swerve Southern Nevada > … > 11-Juniper Canyon > Brownstone Wall
 2
5.10- 6a 18 VI+ 18 E1 5a Trad
Birdland Southern Nevada > … > 10-Pine Creek C… > Brass Wall
 920
5.7+ 5a 15 V+ 13 MVS 4b Trad 6 pitches
The Nightcrawler Southern Nevada > … > 11-Juniper Canyon > Brownstone Wall
 215
5.10+ 6b+ 21 VII+ 20 E3 5b Trad, Sport 5 pitches
Unimpeachable Groping Southern Nevada > … > 11-Juniper Canyon > Ginger Buttress
 387
5.10b 6a+ 19 VII- 19 E2 5b Sport 7 pitches

Ticks View All 6

5.9- 5c 17 VI 16 HVS 4c
 289
Armatron
Mar 25, 2018 · Lead / Redpoint. Led 1,3,6. Smitty led 2,4,5.
Trad 6 pitches
5.9 5c 17 VI 17 HVS 5a
 297
Moonshine Dihedral
Mar 18, 2018 · 1 pitch. Lead / Redpoint.
Trad 2 pitches
5.9 5c 17 VI 17 HVS 5a
 252
Ashtar Command
Jan 12, 2018 · Lead / Onsight. Followed pitch 1, OS lead pitch 2. P2: First two bolts runout. Tricky mantle near the top.
Trad 2 pitches
5.10c 6b 20 VII 20 E2 5b
 124
Living On The Edge
Jan 8, 2018 · 1 pitch. Lead / Flash. Climbed first pitch only.
Trad 4 pitches
5.10c 6b 20 VII 20 E2 5b
 100
Buffalo Power
Aug 30, 2017
Sport
5.10b 6a+ 19 VII- 19 E2 5b
 58
Cornercopia
May 23, 2015
Trad
Route Name Location Star Rating Difficulty Date
Armatron Southern Nevada > … > 11-Juniper Canyon > Brownstone Wall
 289
5.9- 5c 17 VI 16 HVS 4c Trad 6 pitches
Mar 25, 2018 · Lead / Redpoint. Led 1,3,6. Smitty led 2,4,5.
Moonshine Dihedral Central Oregon > Smith Rock > (k) The Dihedrals
 297
5.9 5c 17 VI 17 HVS 5a Trad 2 pitches
Mar 18, 2018 · 1 pitch. Lead / Redpoint.
Ashtar Command Zion NP > Mount Carmel Tu… > Ataxia Tower
 252
5.9 5c 17 VI 17 HVS 5a Trad 2 pitches
Jan 12, 2018 · Lead / Onsight. Followed pitch 1, OS lead pitch 2. P2: First two bolts runout. Tricky mantle near the top.
Living On The Edge Saint George > … > Island In The Sky > Aftershock Wall
 124
5.10c 6b 20 VII 20 E2 5b Trad 4 pitches
Jan 8, 2018 · 1 pitch. Lead / Flash. Climbed first pitch only.
Buffalo Power Central Oregon > … > (x) The Marsupials > (1) Koala Rock
 100
5.10c 6b 20 VII 20 E2 5b Sport
Aug 30, 2017
Cornercopia Central Oregon > … > W Side > (2) Wildfire Wall
 58
5.10b 6a+ 19 VII- 19 E2 5b Trad
May 23, 2015

Tick Breakdown

Pitches Routes Days Out
90 Days 7 2 2
Last Year 11 5 5
5 Years 12 6 6
All Time 12 6 6

Where drewpduncan Climbs