Mountain Project Logo

Fixed Hardware for Rosy Crucifixion 5.10a/b PG13


5 pieces of fixed hardware

Pitch Use Position Type Description Last Update Condition Installed Notes  
1 Lead 1 Bolt 1/2" x 3" SS PowerBolt w/SS ClimbTech hanger Jul 27, 2014 Bomber Jul 27, 2014 George Perkins noted the lack of P1 lead bolts documentation.
1 Lead 2 Bolt 1/2" x 3" SS PowerBolt w/SS ClimbTech hanger Jul 27, 2014 Bomber Jul 27, 2014 George Perkins noted the lack of P1 lead bolts documentation.
2 Belay 1 Bolt 1/2" x 4.75" SS PowerBolt w/SS ClimbTech double ring hanger Jul 27, 2014 Bomber Jul 27, 2014
2 Belay 2 Bolt 1/2" x 4.75" SS PowerBolt w/SS ClimbTech double ring hanger Jul 27, 2014 Bomber Jul 27, 2014
3 Lead 1 Bolt 1/2" x 3" SS PowerBolt w/SS ClimbTech hanger Jul 27, 2014 Bomber Jul 27, 2014

Fixed Hardware

All Locations
Colorado (1,988)
Boulder (1,495)