Welcome to Baltimore
5.12b YDS 7b French 26 Ewbanks VIII+ UIAA 26 ZA E5 6b British
Early Access
| Type: | Sport, 25 ft (8 m) |
| GPS: | 39.5026, -105.36836 |
| FA: | PH, GH, and RB |
| Page Views: | 542 total · 12/month |
| Shared By: | Alan Prehmus on Mar 14, 2023 |
| Admins: | Leo Paik, John McNamee, Frances Fierst, Monty, Monomaniac, Tyler KC |
Your To-Do List:
Add To-Do ·
Use onX Backcountry to explore the terrain in 3D, view recent satellite imagery, and more.
Now available in onX Backcountry Mobile apps! For more information see this post.
Seasonal Falcon Closures in effect from March 15 - July 31.
- Lion's Head
- Roughneck Area
- Wildcatter Wall
Note that the annual closures of the Park View Dome, The Ranch Hand, Black Creek Wall, and Sawmill Crag have been permanently lifted. These cliffs will continue to be monitored, but will only close if a new nest is spotted.
- Lion's Head
- Roughneck Area
- Wildcatter Wall
Note that the annual closures of the Park View Dome, The Ranch Hand, Black Creek Wall, and Sawmill Crag have been permanently lifted. These cliffs will continue to be monitored, but will only close if a new nest is spotted.
Per: Zach Taylor #656, Park Manager, Staunton State Park:
The closure of Raven will be in effect starting Sept. 10 as hand crews will begin felling trees in the southern area of the work zone.
Mason Creek Trail will remain open until Sept. 29th at which time helicopters should begin flying trees out down to the meadow lot area
Starting Sept. 29, closure of the Mason Creek Trail will force the closures of the Dines and Reynolds Wall areas 7 days a week (per ryan laird).
The Mason Creek Trail will be closed and a helicopter will be assisting the mitigation operations.
The closure of Raven will be in effect starting Sept. 10 as hand crews will begin felling trees in the southern area of the work zone.
Mason Creek Trail will remain open until Sept. 29th at which time helicopters should begin flying trees out down to the meadow lot area
Starting Sept. 29, closure of the Mason Creek Trail will force the closures of the Dines and Reynolds Wall areas 7 days a week (per ryan laird).
The Mason Creek Trail will be closed and a helicopter will be assisting the mitigation operations.
Description
This is a 3 bolt direct start to Flight Bombay. It begins on the obvious diagonal slashes left of Flight Primary. A double shoulder length sling or cordelette is strongly recommended to clip the first independent bolt from FB on the right after you clear the lip.
Location
This route starts on the right margin of the central wall under the left-leaning Flight Bombay ramp.




1 Comment