Type: | Trad, 40 ft (12 m) |
FA: | unknown |
Page Views: | 1,275 total · 27/month |
Shared By: | Owen River on Oct 26, 2019 |
Admins: | Kevin MP, Nate Ball, Micah Klesick |
Your To-Do List:
Add To-Do ·
The footbridge will be closed for replacement from August 14 - September 23, 2023
The old bridge was built nearly 50 years ago and reconstructed about 30 years ago. The new bridge will measure 8 feet wide, about 2 feet wider than the current bridge, and better accommodate visitors and first responders during the park’s frequent rescue operations. There will be no temporary bridge, and Oregon Parks and Recreation Department discourages wading across the river due to sensitive habitat and safety concerns.
Trails that will stay open include:
Rim Rock Trail
Homestead Trail
Rope-de-Dope Trail
Canyon Trail
North Point loop
Climbing areas accessible during construction include:
North Point area (accessible from the Homestead and North Point loop trails)
Rope-de-Dope boulder (accessible from the Rope-de-Dope trail and Canyon Trail)
The Lower Gorge (Climber Access routes)
There are many seasonal raptor closures with varying dates and specific boundaries. These generally effect The Monument, Kiss of the Lepers, Picnic Lunch Wall and/or Smith Rock group, and possibly elsewhere. These usually run from February to the beginning of August, but each closure is usually shorter than this, and is dependent on the birds' behavior. Check this site for details: smithrock.com/seasonal-clos…
The old bridge was built nearly 50 years ago and reconstructed about 30 years ago. The new bridge will measure 8 feet wide, about 2 feet wider than the current bridge, and better accommodate visitors and first responders during the park’s frequent rescue operations. There will be no temporary bridge, and Oregon Parks and Recreation Department discourages wading across the river due to sensitive habitat and safety concerns.
Trails that will stay open include:
Rim Rock Trail
Homestead Trail
Rope-de-Dope Trail
Canyon Trail
North Point loop
Climbing areas accessible during construction include:
North Point area (accessible from the Homestead and North Point loop trails)
Rope-de-Dope boulder (accessible from the Rope-de-Dope trail and Canyon Trail)
The Lower Gorge (Climber Access routes)
There are many seasonal raptor closures with varying dates and specific boundaries. These generally effect The Monument, Kiss of the Lepers, Picnic Lunch Wall and/or Smith Rock group, and possibly elsewhere. These usually run from February to the beginning of August, but each closure is usually shorter than this, and is dependent on the birds' behavior. Check this site for details: smithrock.com/seasonal-clos…
Description
This route has probably been climbed but I didn't see it in any guidebooks. One of the most unique moves in the park. Climb up the big blocks to the right of Huckleberry Hound, then up the chimney and through the "sphincter" to climbers left and ends at the Huckleberry Hound and Lost and Found anchors.
1 Comment