Type: | Sport |
FA: | Jim Ramsey, Jerry Ramsey 1961 |
Page Views: | 640 total · 10/month |
Shared By: | Derrick Peppers on Apr 15, 2018 |
Admins: | Kevin MP, Nate Ball, Micah Klesick |
Your To-Do List:
Add To-Do ·
The footbridge will be closed for replacement from August 14 - September 23, 2023
The old bridge was built nearly 50 years ago and reconstructed about 30 years ago. The new bridge will measure 8 feet wide, about 2 feet wider than the current bridge, and better accommodate visitors and first responders during the park’s frequent rescue operations. There will be no temporary bridge, and Oregon Parks and Recreation Department discourages wading across the river due to sensitive habitat and safety concerns.
Trails that will stay open include:
Rim Rock Trail
Homestead Trail
Rope-de-Dope Trail
Canyon Trail
North Point loop
Climbing areas accessible during construction include:
North Point area (accessible from the Homestead and North Point loop trails)
Rope-de-Dope boulder (accessible from the Rope-de-Dope trail and Canyon Trail)
The Lower Gorge (Climber Access routes)
There are many seasonal raptor closures with varying dates and specific boundaries. These generally effect The Monument, Kiss of the Lepers, Picnic Lunch Wall and/or Smith Rock group, and possibly elsewhere. These usually run from February to the beginning of August, but each closure is usually shorter than this, and is dependent on the birds' behavior. Check this site for details: smithrock.com/seasonal-clos…
The old bridge was built nearly 50 years ago and reconstructed about 30 years ago. The new bridge will measure 8 feet wide, about 2 feet wider than the current bridge, and better accommodate visitors and first responders during the park’s frequent rescue operations. There will be no temporary bridge, and Oregon Parks and Recreation Department discourages wading across the river due to sensitive habitat and safety concerns.
Trails that will stay open include:
Rim Rock Trail
Homestead Trail
Rope-de-Dope Trail
Canyon Trail
North Point loop
Climbing areas accessible during construction include:
North Point area (accessible from the Homestead and North Point loop trails)
Rope-de-Dope boulder (accessible from the Rope-de-Dope trail and Canyon Trail)
The Lower Gorge (Climber Access routes)
There are many seasonal raptor closures with varying dates and specific boundaries. These generally effect The Monument, Kiss of the Lepers, Picnic Lunch Wall and/or Smith Rock group, and possibly elsewhere. These usually run from February to the beginning of August, but each closure is usually shorter than this, and is dependent on the birds' behavior. Check this site for details: smithrock.com/seasonal-clos…
Description
This is by no means worth hiking up here for but if your into bagging summits then it’s another tick on the choss belt. Also, this is a sport route but by sport I mean one single bolt to the anchor. The climbing is easy and the rock is sub par depending on who you ask but good holds are available the whole way. The only move that requires attention has that single new bolt right at your chest. Anchors at the top are not the old slings you see.
Photos
- No Photos -
0 Comments