To save paper & ink, use the [Hide] controls next to photos and comments
so you only print what you need.
Corner Bead
5.6,
Trad, TR, 50 ft (15 m),
Avg: 1.5 from 2
votes
FA: Bernard Gillett and Paul Bodnar, 2006
Colorado
> Lyons
> St Vrain Canyons
> S Fork of St Vr…
> December Wall
Access Issue: MM 23-29.5 - now ended daily CO 7 highway closure/delays
Details
Per Kai Bouwman: the daily CO 7 highway closure/delay access issue is no longer a problem according to CDOT the construction finished as of Nov. 11, 2022. From CDOT: Colorado Highway 7 is closed daily from MP 23-29.5. Motorists can only travel through the area between 6-8 am and 4-7 pm. During these timeframes, pilot cars will lead alternating one-way travel. Drivers should plan for delays, and this schedule will remain in place through Memorial Day 2022.
During the closure, motorists need to take US 36 to CO 7.
codot.gov/projects/co7-lyon…
Description
The left-facing, wide corner just right of
Cove Trim has a fun layback in the middle. Toprope from
Cove Trim's anchors or lead with wide cams (unlikely).
TR slab variation: we did a direct slab TR straight up the line of the rope between
Cove Trim and Corner Bead. The moves are all there with a fun high step on a mica knob as the final crux. We felt it was 10b/c ish.
Location
This is at the base of the Baseboard, down and right from
Door Jam.
Protection