Mountain Project Logo

Darkness 'Til Dawn.  Use a 70m rope to rappel or lower.  If climbing with a 60m rope, you can belay from a ledge at the anchor, bring up your second, then carefully rappel and downclimb the last 30' to the base.<br>
<br>
If lowering with a 60m rope (NOT recommended):<br>
<br>
1. Tie a knot in the end of the rope!<br>
2. The climber MUST downclimb the last 30' to the base.
ID 1306864

Rate Photo
     Clear Rating
  0.0 from 0 votes

Ron Olsen
May 10, 2005
Darkness 'Til Dawn. Use a 70m rope to rappel or lower. If climbing with a 60m rope, you can belay from a ledge at the anchor, bring up your second, then carefully rappel and downclimb the last 30' to the base.

If lowering with a 60m rope (NOT recommended):

1. Tie a knot in the end of the rope!
2. The climber MUST downclimb the last 30' to the base.  

0 Comments

Nearby Photos