Mountain Project Logo
Rapping down Power Failure. We did it in 2 double-rope rappels, despite several sources of beta that said 3 double rope rappels. Perhaps we used different rap anchors (the ones we used for the 2nd rappel were in the middle of the waterstreak about 50-55m down).
ID 114194861 ·

Rate Photo
     Clear Rating
  0.0 from 0 votes

Steph Abegg
Mar 26, 2018
Rapping down Power Failure. We did it in 2 double-rope rappels, despite several sources of beta that said 3 double rope rappels. Perhaps we used different rap anchors (the ones we used for the 2nd rappel were in the middle of the waterstreak about 50-55m down).  
John Wilder
Las Vegas, NV
John Wilder   Las Vegas, NV
If you stay on Power Failure, it's 3 rappels- I found that station you used several years ago by accident and have used it ever since. Mar 27, 2018

Nearby Photos