The first rappel. All of the rappels are off the belay anchors on the route. We made 8 double-rope rappels (rapped from anchors at tops of: P11, P9, P8, P7, P5, P4, P3, P1) to get down although I think we could have done it in 7 (could probably rap all the way to P2 from P). You definitely need two ropes (or a single 80m rope) to rappel the route, as some pitches are up to 40m long.
ID 112041631

Rate Photo
     Clear
  0.0 from 0 votes

Steph Abegg
Aug 1, 2016
The first rappel. All of the rappels are off the belay anchors on the route. We made 8 double-rope rappels (rapped from anchors at tops of: P11, P9, P8, P7, P5, P4, P3, P1) to get down although I think we could have done it in 7 (could probably rap all the way to P2 from P). You definitely need two ropes (or a single 80m rope) to rappel the route, as some pitches are up to 40m long.

0 Comments

Nearby Photos