Step 2: Tied off munter-mule with overhand back-up. the red sling and wire gate are clipping the loop of the munter-mule to the masterpoint.
ID 111764045

Rate Photo
     Clear
  0.0 from 0 votes

Dylan B.
Apr 9, 2016
Step 2: Tied off munter-mule with overhand back-up. the red sling and wire gate are clipping the loop of the munter-mule to the masterpoint.

0 Comments

Nearby Photos