Mountain Project Logo

Did it without rope drag at all. Back clean 1st and 2nd bolt on P1, use shoulder length on 3rd and 4th. Skip the anchor and back clean the 1st bolt on P2 and 5th (one under the roof). Maybe good idea not to unclip the 2nd bolt on P1 for better protection of follower.
ID 110025803

Rate Photo
     Clear Rating
  0.0 from 0 votes

Kazu Watanabe
Feb 2, 2015
Did it without rope drag at all. Back clean 1st and 2nd bolt on P1, use shoulder length on 3rd and 4th. Skip the anchor and back clean the 1st bolt on P2 and 5th (one under the roof). Maybe good idea not to unclip the 2nd bolt on P1 for better protection of follower.  

0 Comments

Nearby Photos