Mountain Project Logo

This is how we rigged our setup - We Built a 3 Sling Anchor from the top railing near the NPS sign.  To get the final climber back up - we used a top belay system.  Brandon pictured foreground, was hanging via PAS and taking up slack as I climbed back up.
ID 109782080

Rate Photo
     Clear Rating
  0.0 from 0 votes

Kat Richards
Dec 3, 2014
This is how we rigged our setup - We Built a 3 Sling Anchor from the top railing near the NPS sign. To get the final climber back up - we used a top belay system. Brandon pictured foreground, was hanging via PAS and taking up slack as I climbed back up.  

0 Comments

Nearby Photos