Mountain Project Logo


Rate Photo
Rating Rating Rating Rating Rating      Clear Rating
  0.0 from 0 votes

S.Mckinna
Jul 24, 2012
Drive equipment removed. The mounting location is bottom left obscured by a couple of hoses. The blue gearbox is connected to the bullwheel with the drive shaft on the right leaning on even more equipment removed. It can be a challenge to move this stuff around the drive shaft alone is in the range of 1500 lbs and about 5' x 10".  

0 Comments

Nearby Photos

Welcome

Join the Community

Create your FREE account today!
Already have an account? Login to close this notice.

Get Started