Mountain Project Logo

Don't go straight up here for The Long Lead.  Face climb on pockets to the right.  <br>
<br>
Does anyone know what the climb straight up is?
ID 107546215

Rate Photo
     Clear Rating
  0.0 from 0 votes

Tim Heid
Apr 7, 2012
Don't go straight up here for The Long Lead. Face climb on pockets to the right.

Does anyone know what the climb straight up is?  
Chris Greevers
San Tan Valley, az
Chris Greevers   San Tan Valley, az
Ditto what Eric said.
Except I did it like 13 years ago. Apr 17, 2013
I climbed this Alturneitive pitch to the long lead 15 years ago, not sure if it had been done befor. Super fun I'd say the grade does not change, still 5.9. You climb the short corner, pull the roof and head towards the big ledge befor the chimney. Gear was ok, the rock was loose and typical for the superstions. Mar 12, 2013

Nearby Photos