Mountain Project Logo

USFS Designated Utility Corridor in red.  Rather than re-build the line here, WAPA is proposing a costly and damaging re-route away from the Pew Crocker Ranch and into the Public's scenic byways and National Forest where no utility corridor exists.   We still have a little time to change the course of this damaging proposal, but the proposed construction start date is Spring 2012 (Click to Enlarge).
ID 107469853

Rate Photo
     Clear Rating
  0.0 from 0 votes

responsiblelines
Feb 10, 2012
USFS Designated Utility Corridor in red. Rather than re-build the line here, WAPA is proposing a costly and damaging re-route away from the Pew Crocker Ranch and into the Public's scenic byways and National Forest where no utility corridor exists. We still have a little time to change the course of this damaging proposal, but the proposed construction start date is Spring 2012 (Click to Enlarge).  