Mountain Project Logo

First set of bolts / belay station.
ID 106924596

Rate Photo
     Clear Rating
  0.0 from 0 votes

Derick L
Oct 14, 2010
First set of bolts / belay station.  
A much safer set up would be to have the baskets of the carbiners down and the crotches up with the gate on far right carabiner facing out to the right. The load will be on the spines of the carabiners. The three slings should be tied with a figure eight. Twist and squeeze the gates to make sure they are truly locked. Safe climbing makes for Fun climbing. Steve Thaw, Moraga, California Nov 9, 2015
Ben Griffin
Durango, CO
Ben Griffin   Durango, CO
This looks like a nice anchor to equalize. Dec 17, 2012

Nearby Photos