Mountain Project Logo

Step 6: Using the slack of the lead line, tie a munter-mule w/ an overhand backup and attach it to the anchor (eliminate as much slack from the system as possible).
ID 106783349

Rate Photo
     Clear Rating
  0.0 from 0 votes

Micah Lewkowitz
Jun 1, 2010
Step 6: Using the slack of the lead line, tie a munter-mule w/ an overhand backup and attach it to the anchor (eliminate as much slack from the system as possible).  

0 Comments

Nearby Photos