Mountain Project Logo

all pitches require double ropes to rappel.  Entire route can be rappelled with 2 -- 60 meter ropes
ID 106565923

Rate Photo
     Clear Rating
  0.0 from 0 votes

arden
Oct 9, 2009
all pitches require double ropes to rappel. Entire route can be rappelled with 2 -- 60 meter ropes  
wayne wallace
Seattle
wayne wallace   Seattle
I Really enjoyed having 70meter ropes for the rappels. Jun 13, 2015

Nearby Photos