Add Photo Add Comment
Slab up through three bolts, place some gear on the left, and run it up to a pin, then up into the trees. Hand drilled on lead. Maybe a little runout as the leader was tired of drilling.
The slab to the right of the base of the GWI.
3 bolts, a pin, and some gear