Mike Amato showing the ends of his 60m rope after lowering off from the top of the second pitch. With rope stretch, he barely made to down to a safe spot.
Better alternatives: 1. With a 60m rope, bring your partner up to the top of p2 and rappel straight down. 2. Use a 70m rope if you want to lower off from the top of p2. 3. Do the climb in two pitches.
Edit: The climb now has 3 pitches, so it's probably best just to do it as a two- or three-pitch climb and descend by rappel.